UW-Madison Lifesaving Station
144 East Gilman Street
This project include five main elements: (1) slope stabilization and erosion prevention, (2) dredging of the boat slips and approach channel, (3) altering, extending and/or re-armoring of the breakwater, (4) fuel tank relocation, and (5) seawall repair.
Developer
UW Madison
Construction Type
Renovation
SHARE